INDUSTRIAL

ENERGY, OIL AND GAS

“Fossil fuel power stations, nuclear, solar, special locations, etc. around the world they need fast safe lifting requirements for specific environments with very high demands.”

HOW WE WORK FOR
THE ENERGY SECTOR AND THE OIL AND GAS SECTOR

Client: UNIÓN FENOSA

Ubication: Thermal Central del Narcea

The power plant of Narcea It is located in the municipality of Tineo, province of Asturias, on the banks of the River Narcea,
tributary of the Nalón.

Their electricity production is conventional thermal origin and feedstock has internal energy of fossil fuel used in the combustion process.

Elevator access to the different floors of the boiler was obsolete and needed replacing.

BACKGROUND

Prior to removal, it was necessary to strengthen the entire structural system of the landings that were supported on the mast of the old elevator to avoid the collapse of the structure

THE PROYECT

The project required the design of various types of bracings, all sides, with different lengths and characteristics and different distances between the bracings. Thus, the elevator adapted to the physiognomy of the boiler.

THE SOLUTION

A permanent equipment was installed under the Machinery Directive, most suitable and reliable for the needs of Central.

Client: COBRA AND SENER

Location: Regasification plant  SAGGAS in SAGUNTO

In April 2006 this new liquefied natural gas (LNG) was inaugurated.

The Sagunto regasification plant is located at the south end contradique of Sagunto port expansion on a platform of 23 hectares reclaimed from the sea.
With four tanks of 150,000 m3 each, the plant has a storage capacity of 600,000 m3.

The annual output of the plant can handle up to 25% of domestic demand for natural gas.

BACKGROUND

The plant requires a fast and secure access to each of the four tanks, in two heights 45 and 56 m, to check measuring levels of these tanks. The previously installed hoists in the plant did not meet the requirements of safety and reliability needed in a regasification plant

THE PROYECT

Dismantle obsolete installations and install lift systems with appropriate security mechanisms.

THE SOLUTION

Industrial Turboiber dismounted and installed lifts the above four elevators and pinion ATEX II3G IIB T3 (prepared to work under explosive atmospheres).

If you want us to send you a quote or want to send us any questions or comments about our products and services, fill out the contact form and we will respond as soon as possible